Our Results
Concrete numbers with clients
See how we organized production and logistics in local companies from Lesser Poland.
Joinery production·
March–June 2024
Reducing window assembly time from 11 days to 38 hours
–82% lead time
For a manufacturer near Bochnia, we changed the delivery planning method and the assembly line layout. We eliminated waiting for components.
Okna-System Bochnia
Agricultural service·
September–November 2023
12,400 PLN recovered monthly in machine service
+148,800 PLN annually
We introduced a simple part scanning system. Mechanics stopped wasting time searching for bolts in the warehouse, and the office stopped forgetting to add them to invoices.
Agro-Naprawa Piotrków
Wholesale materials·
January–April 2024
42% reduction in shipping errors in a warehouse
–42.4% shipping errors
We reorganized the packing zone and introduced QR code verification. The number of returns dropped by nearly half in two months.
Bud-Max Construction Materials
Limited Availability
3 audit slots opened up for February
Next available dates only after March 20. Booking takes 45 seconds.
04
Days
03
Slots